After dealing with building inspector, late winter, ground frost that lasted forever and then spring showers, the excavating and filling for my new garages has finally begun.
This is what had already been done by 12:30 pm today;

They had already scraped off the sod & topsoil and started the fill;

Before removing sod & topsoil the area was about 2 feet below the level I wanted;

By 5 pm they had brought in over 900 yds of fill to bring it up to where I want it.
One garage will be in the leveled off area seen here;

And the other garage will be to the left of the drive. It's a little hard to see from this angle;

Each garage will be 1000 sq. ft. with 2 overhead doors plus an entry door 36" wide, Wide enough to run motorcycles through. And the garage spaces are 6' apart so I don't do any nasty door dings. :naughty:
This is what had already been done by 12:30 pm today;

They had already scraped off the sod & topsoil and started the fill;

Before removing sod & topsoil the area was about 2 feet below the level I wanted;

By 5 pm they had brought in over 900 yds of fill to bring it up to where I want it.
One garage will be in the leveled off area seen here;

And the other garage will be to the left of the drive. It's a little hard to see from this angle;

Each garage will be 1000 sq. ft. with 2 overhead doors plus an entry door 36" wide, Wide enough to run motorcycles through. And the garage spaces are 6' apart so I don't do any nasty door dings. :naughty: